Date and batch coding
Review changing dates, batch numbers or traceability content on compatible product and packaging surfaces.
FY-LMM04 is a flying marking platform for products moving through production or packaging lines. Specify motion, product detection, code content and line communication together before selecting the source and optics.

Confirm the final equipment and configuration in the quotation.
Review changing dates, batch numbers or traceability content on compatible product and packaging surfaces.
Coordinate the marking position with product motion, spacing, detection and the available process window.
Define counters, database fields, PLC signals and any verification or reject process before choosing the control arrangement.
Match the equipment to the material, part and production workflow.
A single nominal speed leaves important conditions undefined. Include acceleration, speed variation, product spacing and stability at the proposed marking position.
The control method depends on line conditions. Variable speed or tighter registration can call for encoder feedback; confirm it with the integration proposal.
Confirm the final equipment and configuration in the quotation.
Material response, artwork size and content affect what can be completed as the product passes. Test the actual surface and complete code at the required operating conditions.
Material, optics, filled area, code detail and required contrast all affect the process window. Agree speed against an application test rather than a scanner-speed figure.
Confirm the final equipment and configuration in the quotation.
Identify who supplies the trigger, code data and verification decision. Agree communication, timing and fault handling before equipment and controls are finalised.
Available interfaces depend on the software and project architecture. Provide the data format, communication method and update requirements for review.
Confirm the final equipment and configuration in the quotation.
Confirm the final equipment and configuration in the quotation.
| Machine format | FY-LMM04 flying production-line marker |
|---|---|
| Product movement | Specify full speed range and product spacing |
| Detection / motion feedback | Confirm trigger sensor and encoder requirements |
| Data / line communication | Confirm code source, PLC, verification and reject signals |
| Laser source / power | Select for the actual surface and required mark |
| Lens / marking field | Confirm code size, detail and installation clearance |
| Process acceptance | Approve sample quality, placement and operating speed |
| Installation scope | Confirm mounting, guarding, extraction, utilities and software |
The platform is identified below; the quoted equipment and operating values depend on the approved application.
For source selection, compare fiber , MOPA , CO2 and UV laser marking machines .
| Item | Configuration / information to confirm |
|---|---|
| Machine platform | FY-LMM04 flying production-line marker |
| Product motion | Specify minimum, normal and maximum line speed and product spacing |
| Line interfaces | Confirm trigger, encoder, PLC, code source and verification or reject signals |
| Laser source and rated power | Selected for the material and required mark; confirm the exact source in the quotation |
| Lens and marking field | Confirm artwork dimensions, smallest feature, depth and required contrast |
| Process performance | Agree sample result and cycle or line-speed target for the actual material |
| Utilities and supply scope | Confirm electrical supply, cooling, extraction, computer, software and fixtures |
No. It shows a particular setup. Your material, full code, product motion and acceptance criteria must be evaluated together.
Document the actual spacing and detection conditions. The integration review must determine triggering, code timing and handling of missed or unsuitable products.
Confirm the project scope. Verification equipment, decision signals and reject hardware must be identified separately in the line proposal.
Send a line video or layout, speed range, product spacing, material and complete code. Include sensor, encoder, PLC and verification requirements for an FY-LMM04 integration review.
Continue on our contact page to share your application and request a configuration.
Discuss my application ↗